Comments by "doveton sturdee" (@dovetonsturdee7033) on "HMS Vanguard - Guide 132 (Extended Look)" video.
-
41
-
40
-
4
-
3
-
2
-
Because, from the perspective of 1939/40, the first two Lions wouldn't be ready before 1943. As the biggest bottleneck in building was the production of the 16 inch triple gun barbettes, and as the four twin fifteen inch barbettes taken out of Courageous & Glorious were available in store, the decision was made to place a contract for a ship build to a modified Lion design, with an obsolete, but serviceable, main armament, which (ironically, as things turned out,) could enter service more quickly.
As the war situation developed, design changes regularly delayed construction (at one time, consideration was given to converting Vanguard to an aircraft carrier) resulting in her not being completed until 1946.
1
-
1