Comments by "Tony Wilson" (@tonywilson4713) on "The Newsmakers" channel.

  1. Its only $268b on the project with $100b in contingency and Virginia's cost AU$5.5b each not $3b each. But even the right numbers make this a ridiculous deal. The fundamental problem with AUKUS is not that it was an agreement between Australia the UK and America or that it was for nuclear powered submarines. I'm an engineer and the REAL PROBLEM is the project itself which is hopelessly conceived and its costs are mindlessly stupid which is par for the course with Australian military agreements. I'm 100% in favor of Australia getting nuclear powered subs but am 100% against AUKUS. Because of how much ocean we need to patrol we need faster long range subs and nuclear powered subs are over 50% faster than subs like the Collins and that's the first of several points. Here's my 2 main points on why AUKUS needs to be ripped up and started over. 1) The Virginia requires too large of a crew and there's just no way Australia can operate more than 2 of them let alone 3 or 3 + 5 of the AUKUS subs. This point has been brought up again and again and the RAN has never answered how they'd solve this problem. 2) The basic cost of a Virginia class is AU$5.5billion and the project is costed at AU$33.5billion per sub. NOBODY has explained where the other $28billion per sub is going. I have done some research and costing on this. I even constructed a project costing model and started plugging in numbers. I threw everything I could at this and then started doubling the cost of things and even tripled some and then added in an outrageous bonus system to get stuff built on time. With all I tried I could not explain where over AU$115billion might be going.
    5
  2. The fundamental problem with AUKUS is not that it was an agreement between Australia the UK and America or that it was for nuclear powered submarines. I'm an engineer and the REAL PROBLEM is the project itself which is hopelessly conceived and its costs are mindlessly stupid which is par for the course with Australian military agreements. I'm 100% in favor of Australia getting nuclear powered subs but am 100% against AUKUS. Because of how much ocean we need to patrol we need faster long range subs and nuclear powered subs are over 50% faster than subs like the Collins and that's the first of several points. Here's my 2 main points on why AUKUS needs to be ripped up and started over. 1) The Virginia requires too large of a crew and there's just no way Australia can operate more than 2 of them let alone 3 or 3 + 5 of the AUKUS subs. This point has been brought up again and again and the RAN has never answered how they'd solve this problem. 2) The basic cost of a Virginia class is AU$5.5billion and the project is costed at AU$33.5billion per sub. NOBODY has explained where the other $28billion per sub is going. I have done some research and costing on this. I even constructed a project costing model and started plugging in numbers. I threw everything I could at this and then started doubling the cost of things and even tripled some and then added in an outrageous bonus system to get stuff built on time. With all I tried I could not explain where over AU$115billion might be going.
    3
  3. The fundamental problem with AUKUS is not that it was an agreement between Australia the UK and America or that it was for nuclear powered submarines. I'm an engineer and the REAL PROBLEM is the project itself which is hopelessly conceived and its costs are mindlessly stupid which is par for the course with Australian military agreements. I'm 100% in favor of Australia getting nuclear powered subs but am 100% against AUKUS. Because of how much ocean we need to patrol we need faster long range subs and nuclear powered subs are over 50% faster than subs like the Collins and that's the first of several points. Here's my 2 main points on why AUKUS needs to be ripped up and started over. 1) The Virginia requires too large of a crew and there's just no way Australia can operate more than 2 of them let alone 3 or 3 + 5 of the AUKUS subs. This point has been brought up again and again and the RAN has never answered how they'd solve this problem. 2) The basic cost of a Virginia class is AU$5.5billion and the project is costed at AU$33.5billion per sub. NOBODY has explained where the other $28billion per sub is going. I have done some research and costing on this. I even constructed a project costing model and started plugging in numbers. I threw everything I could at this and then started doubling the cost of things and even tripled some and then added in an outrageous bonus system to get stuff built on time. With all I tried I could not explain where over AU$115billion might be going.
    2
  4. 1
  5. 1
  6. 1
  7. 1
  8. 1