General statistics
List of Youtube channels
Youtube commenter search
Distinguished comments
About
Piccalilli Pit
A Different Bias
comments
Comments by "Piccalilli Pit" (@piccalillipit9211) on "" video.
AN AVALANCHE OF TORY CORRUPTION well that's a shock, I never saw that coming [cough £38 bullion Track and cough Trace cough same price as 4 nuclear carrier battle fleets cough]
137
@hugogreen4916 - its a truly insane amount of money - the 3rd most expensive single project in human history.
14
@3373just - Could have put several gammons on the moon... It could have put 1,520 Gammons into space with Blue Origin. The big point is, you CAN NOT spend £38 billion in one year from scratch on ANYTHING. Its NOT POSSIBLE. Lets say you build a tunnel to Norway - it will take 15 years to do it. 5 years to build a nuclear aircraft carrier, and they only cost £7 billion. There is NO PHYSICAL WAY it can not be massive corruption.
6
@bikerslow2598 The big point is, you CAN NOT spend £38 billion in one year from scratch on ANYTHING. Its NOT POSSIBLE. Lets say you build a tunnel to Norway - it will take 15 years to do it. 5 years to build a nuclear aircraft carrier, and they only cost £7 billion. There is NO PHYSICAL WAY it can not be massive corruption.
3
@bikerslow2598 - EXACTLY - you CAN NOT SPEND IT on a new project in a year. The Delhi-Mumbai Industrial Corridor is set to cost about $50 - $90 billion and it is to be compleated in an insane time frame of 3 years - 3 YEARS of work after a decade of planning... Its 1483 Km long... Its not a f-ing App. It a thousand miles of infrastructure
2
@mrdaveythebaby - Oh Spitty the nutter is back LOL
2
@bikerslow2598 - The UHVDC Interconnect - a GIANT electricity cable under the sea between MORROCCO and the UK - The overall cost of the project is £16 billion ($21.9 billion). The British company will build a 10.5 GW (7 GW for solar, and 3.5 GW for wind) power plant in Morocco. The transmission cable will consist of four cables. The first cable will be active in early 2027, while the rest are expected to launch in 2029 The WHOLE P{ROJECT - including the solar and the wind turbines and the 4 cables - for thousands of miles under the sea - LESS THAN 50% THE COST OF A COMPUTER APP... This HAS to be the single biggest bit of corruption in western history - these Tories MUST have made out with a Billion £ each for the top people. This project uses up the ENTIRE WORLDS MANUFACTURING CAPABILITY of these cables - but you can spend £38 billion on a computer app...???
2