OK, here we go. One reason for the USN's dramatic cuts in ships under construction was that it had learned its lesson when it built up a huge fleet of Flush Deckers after the Kaiser War which were facing bloc obsolesence in the Thirties. Also, among the hangers on in the under construction category at the end of the WW2 Congress authorized that vessels 80 percent or more complete to be finished, vessels between 60 and 80 percent complete were to be suspended, less than 60 percent were to be scrapped. 1) All pre-war destroyers except two were either expended as targets at Bikini or scrapped. Two Porter class ships were converted as Radar Training ships and rated as miscellaneous auxiliaries (AG) but were scrapped in 1949. The four gun Benson and Gleaves classes went into mothballs, most never to return (some went to allied nations in the Fifties). The only active members of the class were those converted to 3 gun High Speed Minesweepers (DMS). They went into reserve after the Korean War (they were too vulnerable to modern mines) and had a paper re-rating to DD. Almost all the Fletchers also went into reserve, but a bunch were reactivated for the Korean War. Some were converted to ASW Escort Destroyers (DDE) with mount 52 replaced by a trainable Hedgehog or Weapon Able-Alfa, Mount 53 deleted in favor of a dual 3 inch gun and the torpedo tubes replaced by ASW tubes and an additional pair of dual 3 inchers. Many ended up their service being assigned to the Naval Reserve - a few in their 1945 configuration (maybe with updated radars) 2) All prewar subs were either targets at Bikini or were assigned as immobile (props removed) Naval Reserve dockside training ships rated AGSS. One reason for the number of subs remaining relatively high was the Navy was experimenting how to use them against something other than an island nation (Lookin' at you, Russia). It also converted a bunch to Fleet Snorkel, Guppy 1, Guppy 1A, Guppy 1B, Guppy Ii and Guppy III's. The Guppy 1's were a hurried conversion in 1945 - streamlined with more powerful batteries but no snorkel - designed to prove the concept and soon relegated to serving as ASW targets. The Fleet Snorkels were caused by a lack of funding to convert the number of subs desired to Guppy configuration. It removed the guns and installed a streamlined sail and snorkel. They retained their original batteries and unstreamlined hull, so had considerably reduced performance underwater compared to the Guppy's. Unconverted Fleet boats ended their careers as dockside trainers replacing the prewar boats and were eventually replaced by Fleet Snorkels and some Guppy's https://en.wikipedia.org/wiki/Greater_Underwater_Propulsion_Power_Program 3) DE's were called by Freidman a perfect example of a WAR ship and demonstrating the folly of building a ship of limited capability to perform one mission - ASW in this case. By WAR ship, he meant a ship that had value to a war time navy, but either none or limited value in the missions navies perform in peace time. In addition to the DE's, he also included the Vietnam "Brown Water Navy", the RN's Hunt class, which disappered after WW2, and its Coastal Forces. Maybe the Danes and Germans needed them to fight in Baltic, the RN didn't. They were a waste of money for Britain (Tip of the hat to Jackie Fisher and his reforms of the early 1900's). The USN's DE program was huge - 1005 (!) ships were authorized. Of that number, 564 hulls were completed with 94 (of a planned 100) being either converted or completed as APD's (a huge over-strength compared to need) and two suspended at the end of the War being completed in the Fifties as the only steam powered Radar Picket Destroyer Escorts (DER) - part of NOARD's network of radar stations in the Cold War. As early as the Autumn of 1943, the Vice CNO reported that the battle they were designed to fight - the Battle of the Atlantic - was won and there was going to be huge over supply of escorts, when what the USN needed was amphibious shipping. There was considerable debate (including the impact on morale at shipyards where workers had been told the ships they had been building were vital and were now going to be told were unneeded) as to what to do with a large number of seaworthy hulls and eventually the decision was made to complete the last as APD's. I know that may hurt some families who had relatives serve on DE's and APD's but I refer you to Friedman https://www.amazon.com/U-S-Destroyers-Revised-Illustrated-History/dp/1682477576
6
-
Four shipyards built subs for the USN in WW2 of which, Electric Boat had built the first USN sub in 1900, Portsmouth Navy Yard (1920), Mare Island (1930's), In the Thirties, the USN was ordering 6 boats a year, 3 from Electric Boat, 2 from Portsmouth and 1 from Mare Island so they were experienced. The one war time yard, Manitowoc, was a long established civilian yard. "Shipyard President Charles C. West contacted the Bureau of Construction and Repair in 1939 to propose building destroyers at Manitowoc and transporting them through the Chicago River, Chicago Sanitary and Ship Canal, Illinois River, and Mississippi River in a floating drydock towed by the tugboat Minnesota. After evaluating the plan and surveying the shipyard, the Navy suggested building submarines instead. A contract for ten submarines was awarded on 9 September 1940. The Navy paid for lift machinery on Chicago's Western Avenue railroad bridge to clear a submarine. The 15-foot-draft submarines entered the floating drydock on the Illinois River to get through the 9-foot-deep Chain of Rocks Channel near the confluence of the Mississippi and Missouri Rivers. Submarines left the drydock at New Orleans and reinstalled periscope shears, periscopes, and radar masts which had been removed to clear bridges over the river.
Manitowoc had never built a submarine before, but the first was completed 228 days before the contract delivery date. Contracts were awarded for additional submarines, and the last submarine was completed by the date scheduled for the 10th submarine of the original contract. Total production of 28 submarines was completed for $5,190,681 less than the contract price.
SS-361 through SS-364 were initially ordered as Balao-class, and were assigned hull numbers that fall in the middle of the range of numbers for the Balao class (SS-285 through SS-416 & SS-425–426).[4] Thus, in some references they are listed with that class. However, they were completed by Manitowoc as Gatos, due to an unavoidable delay in Electric Boat's development of Balao-class drawings. Manitowoc was a follow yard to Electric Boat, and was dependent on them for designs and drawings" Before schedule and below cost!
5
-
5
-
4
-
@treyhelms5282 "At the age of 19 in 1907 "he became the only American to win both the US National High Power Rifle and Pistol championships in the same year. In 1914 during the Veracruz campaign in Mexico he drew the fire of three enemy snipers, thereby exposing their positions and then shot them at long range. Lee participated in 14 events at the 1920 Summer Olympics in Antwerp. He won 7 medals (5 gold, 1 silver, and 1 bronze), all in team events. His teammates for the various events were Dennis Fenton, Lawrence Nuesslein, Arthur Rothrock, Oliver Schriver, Morris Fisher, Carl Osburn, Lloyd Spooner, and Joseph Jackson. Lee and Spooner ended the 1920 Olympics with 7 medals each, the most anyone had ever received in a single games." I think he liked to shoot