Comments by "" (@user-si2dr1pn3p) on "Biden defends pulling US out of Afghanistan as Taliban advances" video.

  1.  @noobslayer10101  If the Russians stayed in Afghanistan, the Afghans would now live happily and well. Look at what the USSR was building in Afghanistan: 1. HPP Puli-Khumri-II with a capacity of 9 thousand kW on the river. Kungduz 1962 2. TPP at a nitrogen fertilizer plant with a capacity of 48 thousand kW (4x12) Stage 1 - 1972. Stage II - 1974 (36 MW). Expansion - 1982 (up to 48 MW). 3. Dam and HPP "Naglu" on the river. Kabul with a capacity of 100 thousand kW 1966 Expansion - 1974 4. Power transmission lines with substations from the Puli-Khumri-II hydroelectric power station to Baglan and Kunduz (110 km) 1967 5. Power transmission line with a 35/6 kV substation from TPP at the nitrogen fertilizer plant to Mazar-Sheriff (17.6 km) 1972 6-8. An electrical substation in the north-western part of Kabul and a 110 kV power transmission line from the Vostochnaya electrical substation (25 km) 1974 9-16. 8 tank farms with a total capacity of 8300 cubic meters. m 1952 - 1958 17. Gas pipeline from the gas production site to the nitrogen fertilizer plant in Mazar-i-Sherif with a length of 88 km and a throughput capacity of 0.5 billion cubic meters. m of gas per year 1968 18-19. The gas pipeline from the gas production facility to the USSR border is 98 km long, 820 mm in diameter, and has a throughput capacity of 4 billion cubic meters. m of gas per year, including an air crossing of the Amu Darya river 660 m long 1967, air crossing of the gas pipeline - 1974 20. Looping on the main gas pipeline 53 km long 1980 21. Power transmission line - 220 kV from the Soviet border in the area of ​​Shirkhan to Kunduz (first stage) 1986 22. Expansion of the oil depot in the port of Hairaton by 5 thousand cubic meters. m 1981 23. Oil depot in Mazar-Sheriff with a capacity of 12 thousand cubic meters. m 1982 24. Oil depot in Logar with a capacity of 27 thousand cubic meters. m 1983 25. Oil depot in Puli - Khumri with a capacity of 6 thousand cubic meters. m 26-28. Three road transport enterprises in Kabul for 300 Kamaz trucks each 1985 29. A motor transport company for servicing fuel trucks in Kabul. 30. Service station for Kamaz vehicles in Hairaton 1984 31. Arrangement of a gas production facility in the area of ​​Shibergan with a capacity of 2.6 billion cubic meters. m of gas per year 1968 32. Arrangement of a gas production facility at the Dzharkuduk field with a complex of facilities for desulfurization and gas preparation for transportation in the amount of up to 1.5 billion cubic meters. m of gas per year 1980 33. Booster compressor station at the Khoja-Gugerdag gas field, 1981 34-36. A nitrogen fertilizer plant in Mazar-i-Sherif with a capacity of 105 thousand tons of carbamide per year with a residential village and a construction base 1974 37. Car repair plant in Kabul with a capacity of 1373 overhaul of cars and 750 tons of metal products per year 1960. 38. Airport "Bagram" with a runway of 3000 m 1961 39. International airfield in Kabul with a runway 2800x47 m 1962 40. Airfield "Shindand" with a runway 2800 m 1977 41. Multi-channel communication line from Mazar-i-Sheriff to Hairaton point 1982 42. Stationary satellite communication station "Intersputnik" of the "Lotus" type. 43. House-building plant in Kabul with a capacity of 35 thousand square meters of living space per year 1965 44. Expansion of the house-building plant in Kabul to 37 thousand square meters. m of living space per year 1982 45. Asphalt-concrete plant in Kabul, asphalting of streets and delivery of road vehicles (equipment and technical assistance were supplied through MVT) 1955 46. ​​River port Shirkhan, designed to process 155 thousand tons of cargo per year, including 20 thousand tons of oil products 1959 Expansion 1961 47. Road bridge across the river. Khanabad near the village of Alchin, 120 m long 1959 48. The Salang road through the Hindu Kush mountain range (107.3 km with a 2.7 km tunnel). And what did the Americans build?
    3
  2. 2
  3. 1
  4. 1
  5. 1
  6. 1
  7. 1
  8. 1
  9. 1